Our Projects


Work Experience of Kemnoulli Nig. Limited (Projects)


S/NDATE OF OPERATIONDESCRIPTION OF ACTIVITYClient /
Contact person
S/NDATE OF OPERATIONDESCRIPTION OF ACTIVITYClient /
Contact person
1.1999 - 2002INVESTIGATION OF PAST IMPACTED AREAS - SAMPLING AND ANALYSIS.Pse-rem spdc e/a Port Harcourt.
Prof. Philip shekolo
2.1999 - 2003SUPPLY OF ENVIRONMENTAL FIELD OFFICERS FOR INVESTIGATION OF PAST IMPACTED AREAS - LOCATION SAMPLING SERVICES.Pse-rem spdc e/a
Port-Harcourt.
Prof. Philip Shekolo/dr John Abu
3.2000 - 2002GROUND WATER MONITORING AREA A (LAND OPERATIONAL AREAS)Hse-envs spdc e/a Port-Harcourt.
Dr. Isinguzor.D.
4.2002 - 2005GROUND WATER MONITORING AREA C (SWAMP OPERATIONAL AREAS)Hse-envs spdc e/a
Port-Harcourt.
Mr. Bayo Oyebanji
5.2003 - 2004SUPPLY OF SERVICES FOR DRILLING AND INSTALLATION OF INVESTIGATION / MONITORING BOREHOLES.Pse-rem spdc e/a Port Harcourt
Mr. Emeka Ezeaku
6.2005 - 2006ENVIRONMENTAL MONITORING SERVICES - TURBIDITY STUDY AT TAYLOR CREEK, YENAGOA, BAYELSA STATE.Epg-pn-cfhev, Hse-envs spdc e/a Port Harcourt. Mrs. dada oti
7.2005 - 2007PROVISION OF ENVIRONMENTAL MONITORING FOR WASTE DISPOSAL FACILITYEpg-pn-cfglo integrated waste mgmt. spdc e/a Port Harcourt
Mrs. Enoh Edohoeket
8.2006 - 2007SERVICES FOR CHEMICAL AND BIOLOGICAL ANALYSIS OF SOIL AND WATER SAMPLES.Epg-pn-ppaer spdc rem dept. e/a Port-Harcourt.
Pro. Philip Shokolo
9.2006 - 2007GROUND WATER MONITORING BORE HOLE INSTALLATIONS (PAST IMPACTED AREAS)Epg-pn-ppaer spdc rem dept. e/a Port-Harcourt.
Dr. Adoki Akuro
10.2007CLEAN UP OF OIL SPILL ALONG THE 18" TEBIDABA/BRASS PIPELINE NEAR IKEBIRI COMM.EQC-DEPT NAOC Port-Harcourt
Mr. s. Lovina E.g. Bufor
11.2007CLEAN UP OF OIL SPILL ALONG 14" OGBOINBIRI / TEBIDABA PIPELINE NEAR KOROKOSEI / AZUZUAMA 1, 2 & 3
COMMUNITIES.
EQC-DEPT NAOC Port
Harcourt
Mr. Nuhu Danjuma / Husaini /
Emma
12.2007SERVICES FOR CHEMICAL AND BIOLOGICAL ANALYSIS OF SOIL AND WATER SAMPLES.EPG-PN-PPAER SPDC REM DEPT E/A P/ HARCOURT. Mr. Austin Ebenuwa
13.2007Provision of laboratory services for the certification of remediated NAOC location sites.HSE DEPT. NAOC
MR. NUNU DANJUMA
14.2007Provision of services for biochemical analysis of soil and water samples from remediation sites for eastern / western divisionREMEDIATION DEPT. SPDC
DR. ADOKI AKURO
15.2008 - 2009Statutory sampling, analysis of water, soil and certification of remediated sites in NAOC operational areasHSE DEPT. NAOC
MR. NUHU DANJUMA
16.2008 - 2009Environmental monitoring services (Biological and Chemical Analysis of soil and water samples and Air quality
monitoring of dumpsites/Medical waste incineration site
EPG- PN- CFCLO, INTE.G. RATED WASTE MGT. DEPT. SPDC-EAST
MRS. ENOH EDOHOEKET
17.2008 - 2009Provision of Biochemical AnalysisEPG-PN-CFHEV, SPDC
DR. ADOKI AKURO
18.August 2008Ground water monitoring Borehole installation at Ikot Ada Udoh Well headEpg-pn-ppaer oil spill and remediation dept. Spdc-east Prof. Philip Shokolo
19.August 2008Revegetation of Impacted spill sites4 @ Odidi-1EPG-PN-PPAER OILL SPILL AND REMIDIATION DEPT. SPDC-EAST
DR. DAMIAN AGUIYI
20.03/08-30/12/2007Clean up of oil spill along 12' Ogboinbiri / Tebidaba pipeline near Korokosei
/Azuzuama 1, 2, 3 communities. NAOc
HSE DEPT. NAOC
ADA IKIRIKO/ LOVINA E.G. BUFOR /NUHU ABDULAHI/EBIERI
21.JULY 2009Clean up / Remediation of Impacted spill 2
22.JULY 2009Clean up of oil spill at Oshie 4L flow line.
23.MAY 2009Clean up of oil spill at Pirigbene
24.JAN 2009Remediation at Eneka & OgaleEPG-PN-PPAER OILL SPILL AND REMIDIATION DEPT. SPDC-EAST
MR USMAN
25.October 2010Environmental monitoring services Biochemical and microbial analysis of soil and water samples from Chevron abandoned drill site. Air quality monitoringSub-contract from environmental accord Mr. Salau Ibrahim
26.JUNE 2010CLEAN-UP / REMEDIATION OF IMPACTED SPILL @ Iriama, SPDC west.Epg-pn-ppaer oil spill and remediation dept. Spdc-east Dr. Damian Aguiyi
27.JAN. 2011 -2014Supply of services for installation of ground water monitoring Bore holesEpg-pn-ppaer oil spill and remediation dept. Spdc-east Dr Adoki Akuro / Philip Shokolo
28.JAN. 2011 -2014Environmental monitoring services
Air quality monitoring, Biochemical and microbial analysis of soil and water samples from DUMPSITES/REMSITES/CLEANUP SITES/PIA.
Epg-pn-ppaer oil spill and remediation dept. Spdc-east Dr Adoki Akuro / Philip Shokolo
29.2013 - DateEnvironmental monitoring services
Air quality monitoring, Biochemical and microbial analysis of Rain, Storm, ground water samples and Effluent monitoring
services at Ogbogu gas plant and OLO flow station for TOTAL E & P NIG. LTD.
HSE –ENVS DEPARTMENT TOTAL E & P
NONYELUM OTE.G. BULU/N.
AHIAMADU
30.2013 - DateProvision of services for biochemical analysis of Soil, Sediment and water samples from remediation sites for OGONI restoration project, SPDC eastern divisionREMEDIATION RESTORATION TEAM SPDC.
EAST
MR. AUGUSTINE
IGBUKU/PROF PHILIP SHEKOLO/FRANKLIN IGBODO
31.2014 – 2015Provision of services for sampling and analysis of Soil, Sediment and water samples from remediation sites for NAOC – EAST. For regulatory certification/close out.HSE ENVS NAOC, PHC
MR. ADA IKIRIKO
MR. NUHU DAHIRU
32.2014 – 2015Provision of services for biochemical analysis of Soil, Sediment and water samples from remediation sites for OGONI restoration project, SPDC eastern divisionOGONI RESTORATION PROJECT (ORP) TEAM SPDC. EAST
MR. AUGUSTINE IGBUKU /
FRANKLIN IGBODO
33.Oct, 2014- Feb
2015
Drilling/ installations of community drinking water, civil construction of fence, install solar
panels/1.5hp solar sumo pump, 6,000ltrs
water storage facility and water reticulations at Eneka Oil spill impacted community.
SPDC REM DEPARTMENT. CONTACT: ANDY LEE/OGUNS OKE.
34.2015- DATEProvision of services for biochemical analysis of Soil, Sediment and water samples from remediation sites for OGONI restoration project, SPDC eastern divisionOGONI RESTORATION PROJECT (ORP) TEAM SPDC. EAST
MR. AUGUSTINE IGBUKU /
FRANKLIN IGBODO
35.2015- DATEEnvironmental monitoring services
Air quality monitoring, Biochemical and microbial analysis of Rain, Storm, ground
water samples and Effluent monitoring
services at Ogbogu gas plant OML 58 and
AMENAM FPSO, OML 99 for TOTAL E & P NIG. LTD.
HSE –ENVS DEPARTMENT TOTAL E & P
NONYELUM OTE.G. BULU/N. AHIAMADU